|
|
![]() |
|
|||
|
|
||||
|
||||
|
|
![]() |
|
Cascade Engineering Introduces Maintenance-Free Frontload Containers GRAND RAPIDS, Michigan, October 12, 2004, - The life of a heavy-duty waste container continues to get longer, stronger and more efficient, thanks to Cascade Engineering’s new Rotational Molded (RM) Frontload Container. The Grand Rapids, Mich.-based company, a leader in injection molded plastics for the automotive, industrial and waste management industries, has introduced the new Frontload Container as a time- saving, cost-effective and more environmentally friendly solution for heavy-duty waste disposal. The new heavy-duty plastic containers replace the traditional metal waste containers which required frequent painting, dent repair and general maintenance, and had a much shorter life-span. Locations such as school playgrounds, corporate waste facilities, municipalities and apartment complexes are ideal for the new containers. The Company noted several other important improvements on the new Frontload Container. The new designs are 30 percent lighter than metal predecessors, allowing for much easier moving and re-positioning. The heavy-duty plastic construction is also graffiti-resistant and UV-stabilized against the long-term effects of the sun. The rugged plastic features optional in-mold name plates for branding and theft reduction, and reduces noise levels during use by up to 50 decibels, making pickups an option even in noise-sensitive locations. “These new bins are a giant step forward for frontload containers and the organizations that use them,” said Cascade Engineering product marketing manager Glenn LeMieux. “We’re in the business of solving customer problems with innovative solutions. These new bins help our waste management customers spend less time worrying about maintenance, up-keep and aesthetics.” The new bins are currently available through Cascade Engineering’s sales force. For more information on Cascade Engineering or the Frontload Container, visit www.cascadeng.com or call (800) 968 2278. < BACK |
| Cascade Engineering Home < Press Room < Press Release Archives < 2004 < Cascade Engineering Introduces Maintenance-Free Frontload Containers | ||